What necessary investigations should be made before screening corrosion and scale inhibitors
As we all know, corrosion inhibitor is a kind of substance added to water that can interfere with the electrochemical action of corrosion and can prevent or reduce the corrosion rate of metal. Before using experimental verification, we should master the actual situation on the site and conduct a comprehensive investigation on the circulating cooling water system to be processed. This is also an important basis for Ande technology to choose recycled water agents. The specific methods are summarized as follows:
(1) Water quality
(1) Understand the source water is surface water or groundwater, whether it is polluted. Groundwater shall be analyzed quarterly for not less than one year. If there are several Wells, the water quality of each well should be known. For surface water, complete monthly analysis data of not less than one year should be collected.
(2) Supplement water quality to understand whether the raw water, after pretreatment and pretreatment methods, the use of flocculant or coagulant varieties. Full monthly water quality analysis data of not less than one year shall be collected. '
(3) water quality of circulating cooling
If the circulation system has been in operation, the on-site circulating water quality data can be directly used as the basis for selecting the formula. However, data should be selected when the concentration multiple is stable, at least monthly data for a year. The data at natural pH values should be known as far as possible. '-
(2) Design data of circulating cooling water system
Need to understand the type of cooling tower, circulating water FFI (m3/h), the system 'volume V (m3), the design of inlet and outlet tower water temperature (°C). It is also necessary to know the concentration multiple possible for the system and the effluent B(m3/h), wind-blown loss D(MVh) and replenishment M(m3/h) at the operating multiple. And understand the annual temperature, humidity and water temperature trends. ,
The average residence time of the agent in the system, T[V7(B+D)], should not exceed 50h in order to prevent the agent from decomposing or precipitating from hydrolysis.
(3) Data and process characteristics of the water cooler
Need to understand all the data of water treatment cooler, including the number, model, structure, material, thermal strength, process medium inlet and outlet water temperature, water flow rate and other issues.
(4) Understand the surrounding discharge environment and air pollution, understand the environment of the area through which sewage flows after discharge, whether there are agricultural crops, aquatic crops and the final discharge water area, etc., all of which will affect the stability of the circulating water system.
主站蜘蛛池模板: 92午夜免费福利757永久 | 国产美女a做受大片观看 | 日日夜夜天天久久 | 免费特级黄色片 | 四虎网站最新 | 精品国产免费人成在线观看 | 爱逼综合| 在线播放一区二区精品产 | 免费大片黄在线观看日本 | 最近日本免费观看视频 | 精品福利一区二区三区 | 免费观看成人 | 精品动漫一区二区三区 | 二区在线观看 | 免费爱爱网站 | 欧美日韩国产高清 | 欧美一级毛片国产一级毛片 | 欧美va| 精品视频一区二区三区在线观看 | 美日韩一区二区三区 | 性欧美16sex性高清播放 | 欧美特级黄 | 日本黄色大片免费观看 | 欧美 日韩 亚洲 中文字幕 一区 | 久久伊人男人的天堂网站 | 免费一级 一片一毛片 | 天天干天天拍 | 欧美色精品天天在线观看视频 | 爱爱视频免费在线观看 | 毛片网| 国产在线观看成人 | 日韩在线视频一区 | 亚洲欧美日韩中文字幕一区二区三区 | 亚洲国产精品自产拍在线播放 | 国产视频毛片 | 日韩美女视频一区 | 欧美日韩国产成人综合在线 | 成年人性网站 | 成人免费看黄页网址大全 | 国产性生大片免费观看性 | 亚洲日本乱码在线观看 |